Kinerja
4.9/5
  • ≤2h
    Rata-rata waktu respons
  • 100.0%
    Tingkat pengiriman tepat waktu
  • US $350,000+
    {0} pesanan
Kustomisasi Minor
Kustomisasi dari Desain
Pemeriksaan Produk Jadi
Pemeriksa QA/QC (3)
Lihat semua kapasitas terverifikasi ({capacitiesNum})

PRODUK UTAMA

Layanan
oleh SGS Group
Solusi proyek satu atap
Solution options (1): other
2D/3D design services
Installation service
Lihat Selengkapnya
2 foto
Jenis: other
China
Houhouyan Hydropower Station is located in Kangding County, Garze Tibetan Autonomous Prefecture, Sichuan Province. It is the ninth cascade hydropower station in the 22-level development plan recommended in the hydropower planning adjustment of the main stream of the Dadu River. Provincial Highway 211 passes along the right bank of the river from Danba County to the mouth of Wasigou, and connects with National Highway 318 at the mouth of Wasigou 65km downstream of the dam site.
Ulasan Perusahaan (21)
4.9 /5
Puas
  • Supplier Layanan
    4.9
  • Pengiriman tepat waktu
    4.9
  • Kualitas Produk
    4.9
Fast delivery. Very good price. The service, communication was very good. The parklock is exactly the same like described on their website. The quality is perfect.
    Good quality, timely delivery, easy to communicate. I will place another order with this supplier.
    Lihat semua ulasan